dual certification standards. In handling the import of German-made wastewater treatment equipment, we found that equipment parameters must comply with both the GB18918-2024 national standard and the EU CE Machinery Directive certification. Thiscross-verification of technical parametershas become the primary challenge during customs clearance.Project initiation phase
According to the latest Announcement No. 58 of the General Administration of Customs, imported environmental equipment must30 days before port arrivalcomplete energy efficiency pre-declaration. We recommend adopting a modular customs declaration strategy: splitting the equipment intocore components(tariff rate 5%) andauxiliary systems(tariff rate 8%) for separate declaration. A Japanese-funded enterprise saved 17% in tariff costs through this method.
Based on 20 years of agency experience, we have summarized three effective cooperation models:
A Sino-American joint venturephotovoltaicpanel cleaning equipment project encountered customs clearance delays: due to failure to obtainAutomatic Import License(involving O certificate management) in advance, the equipment was detained at the port for 28 days. After our intervention, we adoptedBatch-by-batch customs clearancestrategy, declaring the core laser components separately, recovering 85% of direct losses. This case reveals three mandatorypre-import reviews:
© 2025. All Rights Reserved.Shanghai ICP No. 2023007705-2PSB Record: Shanghai No.31011502009912