total is expected to exceed $280 billion, with equipment weighing over 5 tons accounting for 37%. Customs clearance for such equipment takes 2.3 times longer than regular goods, andEquipment Imports72% of delay casesstem from avoidable factors like incomplete declaration elements or improper transportation plans.Breakdown of large equipment clearance process
Accurate HS code classification (error rate must be controlled within 3%)
Precision Instruments CategoryEquipped with constant temperature transport monitoring system, vibration test reports must be provided simultaneously during declaration
Construction machinery categoryFocus on handling environmental certification for diesel engines, coordinating with local customs for destination inspection
Complete production linesAdopted batch-by-batch customs declaration strategy, combined with technical drawings filing to reduce the probability of unpacking inspection
A German stamping equipment import project faced three challenges:
After implementing the agency service solution:
© 2025. All Rights Reserved.Shanghai ICP No. 2023007705-2PSB Record: Shanghai No.31011502009912